UP 6920
| Built Sep 1998 at GE Erie, Pa and Rebuilt May 2023 at Wabtec Fort Worth Tex |
AC4400CWM
| 50967 | 5 | 270644 |
UP 6927
| C44ACM. Built Dec 1998 at GE Erie and Rebuilt March 2023 at Wabtec |
AC4400CWM
| 50974 | 6 | 267455 |
UP 6940
| Delivered June 2023 to The Union Pacific Railroad |
AC4400CWM
| 50986 | 11 | 266352 |
UP 6943
| Rebuilt May/June 2023 at Wabtec |
AC4400CWM
| 50989 | | 266506 |
UP 6945
| Rebuilt C44ACM. Delivered to the UP Railroad May 2023 at Wabtec |
AC4400CWM
| | 3 | 266001 |
UP 7089
| Rebuilt C44ACM. Delivered to the UP Railroad June 30th, 2022 at Wabtec |
AC4400CWM
| | 6 | 264506 |
UP 7091
| Rebuilt C44ACM. Delivered to the UP Railroad July 14th,. 2022 at Wabtec |
AC4400CWM
| 50509 | 7 | 264505 |
UP 7267
| Rebuilt C44ACM. Delivered to the UP Railroad September 29th, 2022 Wabtec |
AC4400CWM
| 51573/ New Weight of 432, 000 Lbs | 2 | 263766 |