CA-51 shoves their empties down the SRNJ/CSAO interchange track while a loaded centerbeam occupies the main |
Date:
3/29/2016 |
Location:
Winslow, NJ Map  |
Views:
119 |
Collection Of:

Jacob Rink |
Locomotives: Rolling Stock: |
Author: Jacob Rink
|
 |
Picture Categories: |
This picture is part of album: March 2016 |