Left side view exiting the north (left) end of the Railroad Ave 2-track grade crossing in the Providence & Worcester Railroad yard at Plainfield, CT. Built 9/1982. Marked 'INSP RULE 88B FCRC 6-12'. 2880 cu ft cap. Length 44' 2". |
Date:
3/20/2019 |
Location:
Plainfield, CT Map  |
Views:
39 |
Collection Of:

Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton Haeseler
|
a.jpg) |
Picture Categories: RollingStock,Yard,Track,Action |
This picture is part of album: GACX equipment in CT |